Equipped with a robust 15kW hybrid inverter and 35kWh rack-mounted lithium-ion batteries, the system is seamlessly housed in an IP55-rated cabinet for enhanced protection against water and dust, ensuring reliable performance in various environments.
The Wellington Battery Energy Storage System comprise up to 6,200 pre-assembled battery enclosures with lithium-ion battery packs and associated equipment, transformers, and inverters. An on-site BESS substation will be built with two 330kV transformer bays, 33/0.440kV auxiliary transformers.
The Wellington Battery Energy Storage System (BESS) is planned to be developed in the central west New South Wales (NSW), Australia. The project will comprise a grid-scale BESS with a total discharge capacity of around 400MW. AMPYR Australia, a renewable energy assets developer in the country, owns 100% of the BESS project.
This will make Wellington BESS one of the largest battery storage projects in NSW. Wellington is being constructed at 6773 and 6909 Goolma Road, Wuuluman NSW 2820. The project site is situated within the Central-West Orana Renewable energy Zone (CWO REZ), in the Dubbo Regional Council local government area (LGA).
What is PV & energy storage?
This achieves an integrated "PV + Energy Storage" solution. The cabinet system adopts a modular design, allowing flexible configurations for photovoltaic, batteries, and loads, meeting various user-side applications. During periods of low electricity prices, use the grid to charge the devices.
How will the Wellington Bess project be developed?
The Wellington BESS project will be developed in two stages. The first stage will have a capacity of 300 MW / 600 MWh, while an additional 100 MW / 400 MWh capacity to be added in the second phase.
How will Bess be connected to TransGrid Wellington substation?
The BESS will be connected to the nearby Wellington Substation via an underground or aboveground transmission line. The TransGrid Wellington Substation will be upgraded with a southern bay extension to include an additional 330kV switch bay. The security fencing will be relocated for the development.