The Project would include two new Project substations and two underground transmission lines, one at 115 kilovolts and one at 345 kV, to connect the BESS with the nearby Eversource Substation #250 (Mystic Substation) located at 173 Alford Street, Boston.
From solar-absorbing granite facades that help regulate indoor temperatures to photovoltaic-embedded limestone pathways that generate electricity, these innovations are transforming passive stone surfaces into active energy contributors.